Work Gallery

Onyx Building Group, Inc. is proud to showcase some of our more recent projects.

Mesa College: Center for Business & Technology

Location: San Diego, California
Anticipated Completion: 2018
Project Area: 57,800 ft2
Projected Cost: $32.2 million
Contractor: Balfour Beatty


With construction beginning in August 2017, the center will create collaborative opportunities for students to work together on business ideas and product designs.

The center also will include maker spaces, a movement in education that provides students a room with 3D printers and other tools to create prototypes of products.


Moscone Center Expansion

Location: San Francisco, California
Anticipated Completion: 2018
Project Area: 800,000 ft2
Projected Cost: $551 million
Contractor: Webcor Construction, LP


The expanded convention center will keep San Francisco’s number one industry competitive, create thousands of new jobs, and enhance the neighborhood. Moscone Center currently generates more than 20 percent of the 16.9 million visitors to San Francisco, making it a main driver of business. As the city and the convention landscape continue to grow, this vital facility is expanding to meet future needs.

The above-grade additions and improvements will take place within the current building footprint, allowing for improvements to surrounding open spaces and the introduction of new retail opportunities. Pedestrian-friendly space will replace 25,000 square feet of surface parking and vehicular circulation, exit ways, and ramps. The project will add more than 8,000 square feet of new public open space, including a play area for younger children. Multiple outdoor terraces will provide dramatic city views and can be used for receptions and other events.


Sycuan Casino & Resort

Location: El Cajon, CA
Anticipated Completion: 2019
Project Area: 500,000 ft2 with 60,000 ft2 in gaming space
Projected Cost: $226 million
Contractor: Swinerton Builders Inc.


The $226 million expansion, which will include multiple dining venues and space dedicated for concerts showcasing A-list performers, marks the revival of a project that had been conceived a decade ago but was sidelined by the deep recession of 2008. It is expected to be completed by 2019.

As part of the expansion, the casino floor will grow to accommodate a total of 2,800 machines from the current 2,000, plus 38 more gaming tables.

The new hotel tower, which will feature a contemporary facade of stone, glass and wood, will set aside 50 of its 300 rooms for larger luxury suites, ranging from 376 square feet to 1,150. Also planned is an 8,451-square-foot spa and fitness center and an event center that will include an 11,000-square-foot ballroom designed for a concert-seating capacity of 1,200.

 


Sacramento Entertainment & Sports Center

Location: Sacramento, CA
Completed: 2016
Project Area: 779,200 ft2 in field space
Projected Cost: $558.2 million
Contractor: Turner Construction


The Golden 1 Center reflects the fabric of Northern California by utilizing regionally sourced materials that range from glass to recycled aluminum to potentially precast concrete, composed of sand from San Benito and rocks of Sierra limestone that reflect the colors of the region. Additionally, Golden 1 Center utilizes only FSC-certified wood, an international standard of quality and responsible forest management.

 


Soboba Casino and Resort

Location: El Centro, CA
Completed: February 2019
Project Area: 10,554 ft2 in field space
Contractor: Erickson-Hall


The six-story, 480,000-square-foot replacement Soboba Casino and Resort at Soboba Road and Lake Park Drive in San Jacinto continues to take shape and soon will become one of the largest single commercial structures in the Hemet-San Jacinto Valley.

 


San Diego State University: Student Health Services

Location: San Diego, CA
Completed: 2016
Project Area: 69,000 ft2
Cost: $65 Million
Contractor: O'Connor


The Calpulli Center was built to house the offices of Student Health Services, Counseling and Psychological Services, and Student Disability Services all under one roof. Features of this new outpatient care facility include clinical labs, a pharmacy, urgent care, dentistry, and medical records storage.

 


Pacific Highlands Ranch Fire Station 47

Location: San Diego, CA
Completed: 2008
Project Area: 10,500 ft2
Cost: $5.2 Million
Contractor:


Located in the Carmel Valley area of San Diego, this 10,500 SF leed silver certified facility consists of a three-bay semi-rural station that houses 11 fire-rescue personnel including a Battalion Chief. Designed in the romantic mission style reminiscent of early California and in stewardship of the history of San Diego architecture, it is destined to serve as an icon of the community.

 

555 Raleigh Ave El Cajon, CA 92020 | P: (619) 324-1440 F: (619) 324-1441
Department of General Services Small Business Certification # 1547520 (exp 2/28/19)
California Public Utilities Commission Woman-Owned Business Certification # 14040093 (exp 7/17/19)
© 2019 Copyright Onyx Building Group Lic #957645. All Rights Reserved